Information and Communication Technology or ICTs allow users to take part in a quickly altering universe in which work and other activities are progressively transformed by entree to varied and developing engineerings.

ICT tools can be used to happen, explore, analyze, exchange and present information responsibly and without favoritism. ICT can be employed to give users speedy entree to thoughts and experiences from a broad scope of people, communities and civilizations.

Advantages of Off-the-Shelf

If you can happen an off-the-rack package bundle that will make at least 80-90 % of what you want and you are willing to flex your concern patterns to suit the demands of the bundle, so it may be the best solution for your concern. It is normally more cost effectual ( approximately 10 % -25 % of the cost of usage package ) and it normally has tonss of good thought out characteristics, culled from the input of several users. Besides, it ‘s easier to purchase, because you do n’t hold to be involved with the design and execution.

Disadvantages of Off-the-Shelf

For many concerns, nevertheless, off-the-rack package is non appropriate. It is common for concerns to detect that their off-the-rack bundle wo n’t ever supply the information and capablenesss that they need to efficaciously run their concern. It is frequently difficult to turn up the right bundle ( or even any bundle ) and you must wait months or old ages for the maker to do updates that you need yesterday.

Cost to see

Cost of database system

Extra Software required

Hardware required

Training

Data protection issues

Cost of database system

Database

Monetary values

Advantage Fundraiser

?600+VAT individual user licence

Purposes

From ?290 ( +?90 one-year support )

contactLINK

From ?400 ( +?75 one-year support )

Democracy in Action

$ 25/month for up to 3000 components and $ 35/month for up to 25,000 ( setup $ 100- $ 200 )

ETapestry

Free for up to 500 components and $ 35/month for up to 1000 ( up quickly after that )

GiftWorks

$ 300

KISS

?120 for 1

?60 for excess Personal computers

Lamplight

?10/month ?120/year

Advancement

?15K or more + ?130 per month support

Raiser ‘s Edge

Plan on at least $ 10K to get down and 1000s per twelvemonth in support.

REDABOUT

?50/month or ?550 twelvemonth

WinShark

?100 + VAT per user

Extra Software required

Microsoft Office Home and Student 2007 – $ 99.99

Hardware required

Compaq Q2009 20-inch Widescreen LCD Monitor – $ 139.30

HP 2009M 20-Inch HD LCD Monitor – $ 138.54

Samsung 2233SW 21.5-Inch Full HD Widescreen LCD Monitor – $ 199.99

Dell 3.0 Ghz. Super Fat GX Computer, Gigantic 750GB Hard Drive, 4GB RAM, DVD Burner

( DVD-RW ) , and New Lincensed Windows XP with Genuine Microsoft Authorized CD –

3 used from $ 284.88 1 refurbished from $ 284.88

Proctors

Monetary values

CRT ( 24in )

$ 119.98

CRT ( 23in )

$ 219.99

CRT ( 22in )

$ 229.32

CRT ( 21in )

$ 247.59

LCD ( lcd touch )

$ 118.14

LCD ( lcd 23in )

$ 165.99

LCD ( lcd 3d )

$ 229.95

LCD ( lcd 24in )

$ 184.98

Motherboard Type

Monetary values

athlon 64 3000 central processing unit fan ( AMD Athlon 64 )

$ 49.98

athlon two x2 250 ( AMD Athlon II X2 )

$ 114.80

athlon two x3 435 ( AMD Athlon II X3 )

$ 127.80

nucleus 2 quad ( intel )

$ 126.95

Pentium 4 661 central processing unit fan ( Intel Pentium 4 )

$ 104.98

Pentium 4 651 central processing unit fan ( Intel Pentium 4 )

$ 89.95

phenom 550 ( AMD Phenom II X2 )

$ 144.80

phenom 955 ( AMD Phenom II X4 )

$ 207.80

core 2 extreme ( Intel Core 2 Extreme )

$ 437.80

Printer type

Monetary values

Workgroup

$ 67.99

Radio

$ 15.56

Wide format

$ 139.99

Wide passenger car

$ 220.00

Usb

$ 17.24

Tractor

$ 60.99

Thermal

$ 21.53

Refurbished

$ 50.00

Reception

$ 11.23

Postscript

$ 167.81

Portable

$ 29.99

Pocket

$ 51.81

Laser

$ 42.10

Laser 11×17

$ 405.38

Inkjet

$ 15.98

Dot matrix

$ 11.23

Training

The preparation of the individuals in charge is much more hard and therefore more expensive with a possible job in the operation of the system.

Data protection issues

Software – Security

McAfee

$ 13.50 – mcafee virusscan asset 2009

$ 39.98 – mcafee entire protection

$ 5.00 – mcafee cyberspace security

Norton

$ 14.00 – norton cyberspace security

$ 14.00 – Norton internet security 2009

$ 17.64 – Norton antivirus 2009

$ 24.00 – Norton antivirus 2008

Other

$ 11.78 – personal firewall

$ 11.78 – firewall

We should take off-the-rack database for following grounds

The package tends to be comparatively inexpensive as the cost of development can be spread over a big figure of users

The package can be really sophisticated ( e.g. Excel or Word ) as the grosss from a really big Numberss of users means that a batch of resources can be applied to it ‘s development

It is easy to acquire support and literature is normally widely available as there are many other users utilizing precisely the same package

It is easy to portion files produced by the package with others as opportunities are they besides have the package available to open the file

You do n’t hold to give any of your clip to the development procedure ( e.g. assisting with specifications, proving etc. )

Task – 2

Activity

Description

Duration

Dependence

A

Requirement analysis

10 yearss

Bacillus

Roll uping relevant and accurate informations

7 yearss

A

C

Structured systems analysis

9 yearss

A

Calciferol

Physical design

15 yearss

B, C

Tocopherol

Coding

20 yearss

Calciferol

F

Testing

15 yearss

D, E

Gram

Execution phase

20 yearss

Tocopherol, F

F, G

Advantages of Waterfall Model

The waterfall theoretical account is the oldest and most widely used theoretical account in the field of package development. There are certain advantages of the waterfall theoretical account, which causes it to be the most widely used theoretical account as yet. Some of them can be listed as under.

Acerate leaf to reference, it is a additive theoretical account and of class, additive theoretical accounts are the most simple to be implemented.

The sum of resources required to implement this theoretical account is really minimum.

One great advantage of the waterfall theoretical account is that certification is produced at every phase of the waterfall theoretical account development. This makes the apprehension of the merchandise planing procedure simpler.

After every major phase of package cryptography, proving is done to look into the right running of the codification.

Disadvantages of Waterfall theoretical account

There are some disadvantages of this widely recognized theoretical account excessively.

Ironically, the biggest disadvantage of the waterfall theoretical account is one of its greatest advantage. You can non travel back, if the design stage has gone incorrect, things can acquire really complicated in the execution stage.

Many a times, it happens that the client is non really clear of what he precisely wants from the package. Any alterations that he mentions in between may do a batch of confusion.

Small alterations or mistakes that arise in the completed package may do a batch of job.

The greatest disadvantage of the waterfall theoretical account is that until the concluding phase of the development rhythm is complete, a working theoretical account of the package does non lie in the custodies of the client. Therefore, he is barely in a place to advert if what has been designed is precisely what he had asked for

Waterfall Life Cycle Model

Requirements Analysis

Requirement Analysis is concerned with detecting what the new system is required to make. Some lineation demands are already known from the Business Study and the Feasibility Study, but these are by no agencies sufficient to get down constructing a new system.

SSADM, in common with many other structured analysis methodological analysiss, assumes that we start this phase by analyzing an bing system. This provides a batch of information about how that system works becomes the footing of the demands definition for the new system. Note that an bing system does non needfully intend a computing machine system ; it could be a wholly manual system.

This is surely non the lone attack that can be used for requirement analysis.

The end product from this phase ( if utilizing SSADM ) is a series of different paperss with ‘models ‘ used to depict the bing system, and to depict the concern options that are available to implement the system.

Requirement Specification

The Requirement Specification phase, under SSADM, is concerned with covering the end product of the Requirements Analysis phase into a specification that reflects what the new system is required to make. This involves some farther mold activities which investigate:

The maps the system is required to execute.

The information that underlies the needed system.

How informations alterations over clip as a consequence of events.

Note the importance of informations here. To supply information, we foremost need to place, and so roll up relevant and accurate informations. We besides recognize that the information we require may alter over clip. The usage of theoretical accounts such as these to define demands is a cardinal facet of most structured systems analysis methods. The purpose is to supply a specification that is as clear and precise as possible and which can be understood by the concern director. The purpose is to guarantee no possibility of confusion. Once delivered, it is unpointed if the user says, “ that ‘s non what I understood the system would make ” !

This is critically of import. The usage of different types of theoretical accounts represents a manner of depicting systems. The trouble with any theoretical account is that it needs to be both apprehensible to the concern director and at the same clip, expressive and unequivocal sufficiency to be utile to the IT specializers.

This phase should ensue in the user subscribing credence of the demands for the new system, as identified and recorded by the analyst.

Logical Systems Specifications

The fact that the Requirements Specification phase defines what the new system is required to make does non intend that there is merely one manner in which those demands could be met. There may be several proficient options that could be adopted which would be capable of presenting the needed system. In this phase, the systems analyst foremost decides and defines what those proficient options are and so, with the aid of the concern director, selects the most appropriate. This interaction is of import ; it reflects the thought that the concern director is commanding the development, and it is non controlled by the IT map.

The typical inquiry answered at this phase is, “ what type of computing machine ( IT ) architecture ( platform ) is most suited for the new system? ”

Logical Design

This phase represents a cardinal switch in focal point. Alternatively of concentrating merely on WHAT is required ( systems analysis ) we now start the procedure of make up one’s minding HOW the system can be designed. This procedure of make up one’s minding ‘how ‘ can be farther broken down into a logical phase and a physical phase. Logical design ( this phase ) is concerned with how the system will work, without excessively much notice being taken of the pick of proficient architecture. A logical design could, in

SSADM includes facets such as:

Dialogue design – the screen interface with the users of the system.

Update processes – procedures that change the implicit in system informations.

Question processes – the extraction of utile information from the system ‘s informations.

Logical design should affect the concern director at each phase. Time invested now can salvage clip subsequently, Dialogue design in peculiar, will act upon how the system looks and behaves to its users. This has become more and more of import over clip, peculiarly with the continual progress in the edification of Graphical User Interfaces such as that offered by Windows.

Physical Design

Physical design is the phase where all the design determinations which are dependent on the physical system architecture are made. The primary users of this work will be the coders who will implement the design, so it is of import that the physical design phase provides all the information that they will necessitate.

Physical design is besides the first point at which practical stairss can be taken to guarantee that the public presentation demands of the system will be met. Performance in this sense normally means how rapidly the system can execute cardinal procedures. This is dependent on good physical design more than on any other factor. You will be cognizant that the design for the storage of informations held on the Internet is critical to guarantee the rapid response we all expect from hunt engines ( e.g Google ) .

The consequence of the physical design phase depends on the methodological analysis being followed. A really typical end product is a series of minispecs ( miniature specifications ) that an single coder can work with to bring forth appropriate codification. SSADM defines a whole series of merchandises for this phase, which achieve the same consequence ; to supply the coder with unambiguous definitions of what they must bring forth. This is the last phase defined by SSADM.

With some types of systems, peculiarly those that require really advanced design such as technology, scientific and multimedia, system design are likely to affect research into appropriate algorithms. ( Algorithm – a set of instructions or regulations for transporting out a undertaking or working out a mathematical job in a finite figure of stairss. )

Coding

The structured attack we have described above foliages really small originative infinite for the coder. The function is merely to change over the specification into efficient, maintainable plan codification harmonizing to the criterions that are used by the organisation. In many undertakings, peculiarly for commercial informations treating type systems, that will surely be the instance. Most of the plan codification will be basically repetitive, possibly concentrating on pull offing screen interaction and some implicit in processing. This is where modern scheduling linguistic communications with the lower limit of attempt.

We pointed out that non all undertakings are like this ; those that requirement advanced algorithms will be much more of a challenge to the coder, so the differentiation between system design and scheduling is typically blurred in these systems.

Coding is non usually carried out in one tremendous, individual ball. Normally and sooner, plan codification is written in short pieces that carry out a individual, chiseled map. These plan units are so integrated together. This has effects for the testing stage, which we will reexamine following.

Testing

There are several different signifiers of proving. The first of these, Unit Testing, is normally undertaken by the coder responsible for the plan unit. As the system is assembled, farther testing is carried out on the system once more, typically by the scheduling squad. Finally, the whole system is ready for proving as a system.

Further testing may be carried out by another trial squad and/or by the concern map for which the system was developed. Testing is a big and really of import portion of the development life rhythm.

Execution

Introducing the new system to the working environment.

The execution phase consists of many affiliated activities:

New computing machine equipment may be needed. If so, this will necessitate stipulating telling, put ining and proving.

Users need to be trained, frequently on a particular stray preparation system, where no harm to existent informations can be done.

The new system is installed on the mark computing machine system.

Datas may necessitate to be transferred from an old system.

New informations may necessitate to come in.

The old system and the new system may necessitate to run in analogue for a period to guarantee the new system is executing right.

The execution stage is typically terminated by a formal credence procedure when the concern director declares that she/he is satisfied that the system meets its aims and subscribe off takes topographic point.

Care

The care phase begins one time the execution is complete. Remember that care in Velotec is carried out as a parttime activity by coders. This is typical many medium sized organisations. Maintenance includes mistake repair, updates and alterations which are necessary because demands are falsely understood or specified, demands analysis is non completed in clip, and the demands of the system have changed.

Task – 3

Supplier name: ASIA TECH

No.274-278, Seikkanthar St ( Upper Block ) , Kyauktada Township, Yangon.

Particular: 2 Year Parts and Services Warranty

Motherboard

Processor

Memory

HDD

Graphic

Casing+ PowerSupply

Keyboard+Mouse

Price ( kyats )

ASUS P5G41-MLE

Dual Core 2.7GHz

1GB ( DDR2 )

320GB

No

Delux Casing+500W Orient Supply

Delux KB+Mouse

240,000

ASUS P5G41T-MLX

Dual Core 2.7GHz

2GB ( DDR2 )

320GB

No

Delux Casing + 450W 28A Supply

Delux KB+Mouse

280,000

ASUS P5P41TLE

Dual Core 2.8GHz

2GB ( DDR3 )

320GB

EAH 4350 512MB

Delux Casing + 450W 28A Supply

Delux KB+Mouse

360,000

ASUS P5P43TD

Core2Duo 2.93GHz

2GB ( DDR3 )

32GB

EAH 4350 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

420,000

ASUS P5QL-PRO

Core2Duo 2.93GHz

2GB ( DDR2 )

320GB

EAH 4350 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

405,000

ASUS P7H55D-MPro

Corei3-530

2GB ( DDR3 )

320GB

No

Delux Casing+450W 28A Supply

Delux KB+Mouse

405,000

ASUS P7P55LX

Corei5-750

2GB ( DDR3 )

500GB

EAH 4650 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

530,000

ASUSP7P55DLE

Corei7-860

2GB ( DDR3 )

500GB

EAH 4650 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

655,5000

ASUS P5QL-PRO Turbo

Core2Quad 2.5GHz

2GB ( DDR2 )

320GB

EAH 4350 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

470,000

MSI G41 M4-F

Dual Core 2.7GHz

1GB ( DDR2 )

320GB

No

Delux Casing+500W Orient Supply

Delux KB+Mouse

240,000

MSI P45-C51

Core2Duo 2.93GHz

2GB ( DDR3 )

320GB

EAH 4350 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

415,000

MSI H55M-E33

Corei3-530

2GB ( DDR3 )

320GB

No

Delux Casing+450W 28A Supply

Delux KB+Mouse

395,000

MSI P55-GD65

Corei7-860

2GB ( DDR3 )

500GB

EAH 4650 1GB

Delux Casing+450W 28A Suppy

Delux KB+Mouse

715,000

MSI G31

Dual Core Celeron 1.8GHz

1GB ( DDR2 )

320GB

No

Delux Casing+500W Orient Supply

Delux KB+Mouse

210,000

Foxconn G41MXE

Dual Core 2.7GHz

2GB ( DDR3 )

320GB

No

Delux Casing+450W 28A Supply

Delux KB+Mouse

273,000

Gigabyte G41M-ES2H

Dual Core 2.7GHz

1GB ( DDR2 )

320GB

No

Delux Casing+500W Orient Supply

Delux KB+Mouse

210,000

Gagabyte EP43T-UD3L

Core2Duo 2.93GHz

2GB ( DDR3 )

320GB

EAH 4650 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

435,000

Gigabyte EP45-UD3L

Core2Duo 2.93GHz

2GB ( DDR2 )

320GB

EAH 4650 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

440,000

Gigabye EX58-UD3R

Corei7-860

2GB ( DDR3 )

500GB

EAH 4650 1GB

Delux Casing+450W 28A Supply

Delux KB+Mouse

750,000

ASIA TECH besides Selling

Acer 18.5 ” LCD G195HQbd 111,000 Kyats

ViewSonic 19.0 ” LCD 1940W 132,000 Kyats

Prolink 19.0 ” LCD PRO 1912W 120,000 Kyats

Supplier name: MARVEL TECH Computer Gross saless and Service Centre

No. 171, G-3, Seikkanthar Street ( Middle ) , Kyauktada Township, Yangon.

Particular: After Sale 1 twelvemonth parts & A ; 3 old ages service

Desktop Computer

Price ( Kyats )

-Intel Celeron 2.4 GHz ( 128M/400 )

-Intel 865 ( 478 ) M/B

( W-Sound+LAN+AGP )

-512GB Personal computer 400 ( DDR-I )

-40GB HDD

-ATX P4 Casing + Power Supply

-LCD 15 ” TFT

-Keyboard & A ; PSII Mouse & A ; Pad

Ks-190,000

-Intel Dual Core 1.8 GHz ( 512M/800 )

-Asrock G31M/B

( W-Sound+LAN+AGP )

-1GB Personal computer 800 ( DDR-II )

-320GB HDD SATA

-ATX P4 Casing+Power Supply

-Keyboard & A ; PSII Mouse & A ; Pad

-LCD 15 ” Proctor

Ks-252,000

-Intel Dual Core 2.6 GHz ( 2M/800 )

-Asrock G41 ( W-Sound+LAN+AGP )

( DDRII, III Avilable )

-1GB Personal computer 800 ( DDR-II )

-320GB HDD SATA

-ATX P4 Casing+Power Supply

-Keyboard & A ; PSII Mouse & A ; Pad

-LCD 18.5 ” Monitor ( ViewSonic )

Ks-339,000

-Intel Dual Core 2.6 GHz ( 2M/800 )

-ASUS P5QL/AM M/B

( W-Sound+AND+AGP )

-2GB HDD SATA

-ATX P4 Casing+Power Supply

-Keyboard & A ; PSII Mouse & A ; Pad

-LCD 20 ” Acer Monitor ( P205 )

Ks-378,000

-Intel Core 2 Dual 2.93GHz ( 3M/1066 )

-MSI P43T C51 M/B ( w-Sound+LAN )

-2GB Personal computer 800 ( DDR-II )

-320GB HDD SATA

-Geforce 512/9500 PCI

-ATX P4 Casing+Power Supply

-Keyboards & A ; PSII Mouse & A ; Pad

-LCD 20 ” Acer Monitor ( P205 )

Ks-481,000

-Intel CoreQuat 2.50 GHz ( 4M/1333 )

-GIGABYTE EP41-UD3L M/B

( W-Sound+LAN )

-2GB Personal computer 800 ( DDR-II )

-1GB NX9600 ( PCI Express )

-500GB HDD SATA

-ATX P4 Casing+Power Supply

-Keyboard 7 PSII Mouse & A ; tablet

-LCD 20 ” Monitor ( Acer

Ks-516,000

MARVEL TECH besides selling pressmans

Printers

Price ( Kyats )

Canon IP-1980 Color Printer

Blk-5.5 IPM

Col:4.1 IPM

( 55-Sec )

4800 dpi

40,000 Ks

Canon Laser – 2900 Printer

12 PPM

2400×600 dpi

Cartridge-13,000

125,000 Ks

Canon MX-328 Printer

( Printer, Copy, Scan & A ; Fax ) 4 IN 1

Bik:7.5 IPM, Col:4.5 IPM, Copy: 31 Sec 4800 dpi, Scan: 1200×2400 dpi, Fax: 33.6 kbps

115,000 Ks

Canon Laser – 4320 Printer

( Printer, Copy & A ; Scan ) 3 in 1

1200×600 dpi ( Print )

600×600 dpi ( Copy )

Black – 22 PPM

FX-9 Cartridge 18,000

215,000 Ks

Canon IX – 4000 ( A3 ) Printer

Blk-7.2 IPM,

Col-5.0 IPM,

4800 x 1200dpi

1Pcs Col: Cart: – 40,000, Ink Box – 20000

220,000 Ks

Canon Laser – 3050 Printer

14 PPM

2400 dpi

Cartridge-14,000

100,000 Ks

Canon Laser – 4350 Printer

( Printer, Copy, Scan & A ; Fax ) 4 in 1

Blk-22 PPM,

Fax-33.6 kbp

9600×9600 dpi ( Print )

600x600cpm ( Copy )

Resolution

1200×600 dpi

FX-9 Cartridge – 18,000

330,000 Ks

Canon Laser – 4370 Printer

( Printer, Copy, Scan, Fax & A ; Network ) 4 in1

Print: 32 PPM,

5760 dpi

Transcript: 32 CPM,

Scan: 2400 dpi.

Cartridge-18,000

550,000 Ks

Supplier name: UNiQUE Computer centre

No. 194, Seikkanthar Street ( Middle )

Bet. Mahabandoola & A ; Anawrahta St.

Kyauktada Township,

Rangoon, Myanmar

Particular: Buy any ready Personal computer & A ; acquire

1.Panda Antivirus Pro 2010 ( 1 twelvemonth License )

2.Lifetime Service Warranty

3.Lucky Draw Coupon

Personal computer

Price ( Kyats )

IntelA® 430 CeleronA® 1.8GHz ( 512 KB,800 MHz )

ECS G41T-M ( Intel G41, VGA + Sound +LAN )

Seagate 250 GB SATA2 7200 revolutions per minute with FAN

Kingston 1 GB DDR2 800 MHz

Intel GMA 4500 MHD Graphic

Acer G195HQ 18.5 ” Cystal LCD

LiteOn 24xSATA DVD Writer

PowerBenZ PS2 MyanmarSar Keyboard

Demo PS2 Optical Mouse with Pad

A Open SPK-203 120W USB Speaker

5.1 Channels Integrated Sound

PIV Normal Casing with PowerBenZ 450W eATX PSU

329,000 Ks

InelA® E5300 PentiumA® Dual-Core 2.6 GHz

MSI G41M4-F ( Intel G41, VGA+Sound+GBLAN )

Seagate 250 GB SATA2 7200 revolutions per minute with FAN

Kingston 1 GB DDR2 800MHz

Intel GMA 4500 MHD Graphic

Samsung 943SN+18.5 ” Liquid crystal display

HP 24x SATA DVD Writer

A4Tech PS2 MyanmarSar Keyboard 8520D

A4Tech PS2 Optical Mouse 8520D with Pad

A Open SPK-203 120W USB Speaker

5.1 Channels Integrated Sound

PIV Normal Casing with PowerBenz 450W eATX PSU

373,000 Ks

IntelA® 430 CeleronA® 1.8GHz ( 512 KB, 800MHz )

MSI G31TM-P31 ( Intel G31, VGA+Sound+LAN )

Seagate 250 GB SATA2 7200 revolutions per minute with FAN

Kingston 1GB DDR2 800 MHz

Intel GMA X3100 Graphic

Acer G195HQ 18.5 ” Crystal LCD

LiteOn 24x SATA DVD Writer

A4Tech PS2 MyanmarStar Keyboard 8520D

A4Tech PS2 Optical Mouse 8520D with Pad

A Open SPK-203 120W USB Speaker

5.1 Channels Integrated Sound

PIV Normal Casing with PowerBenZ 450W eATX PSU

335,000 Ks

IntelA® i3-530 Corei3 2.93 GHz

MSI H55M-E33 ( Intel H55, Sound+ GbLAN, HDMI )

Seagate 500GB SATA2 7200 revolutions per minute with FAN

Kingston 2GB DDR3 1333 MHz

Intel HD Graphic

Acer P205 20 ” Wide LED LCD

ASUS 24x SATA DVD Writer

HP Dragon Gaming Keyboard

HP Dragon Optical Mouse with Pad

A Open SPK-203 120W USB Speaker

7.1 Channels Integrated Sound

PIV Light Casing with Golden Field JHT-S410 PSU

573,000 Ks

IntelA® 430 CeleronA® 1.8 GHz ( 512 KB, 800 MHz )

Gigabye G41M-ES2L ( Intel G41, VGA+Sound+GbLAN )

Seagate 250 GB SATA2 7200 revolutions per minute with FAN

Kingston 1GB DDR2 800 MHz

Intel GMA x 3100 Graphic

Acer G195HQ 18.5 ” Crystal LCD

LiteOn 24x SATA DVD Writer

A4Tech PS2 MyanmarSar Keyboard 8520D

A4Tech PS2 Optical Mouse 8520D with Pad

Somic SM-991 Head Set

5.1 Channels Integrated Sound

PIV Normal Casing with PowerBenZ 450W eaTX PSU

345,000 Ks

IntelA® 430 CeleronA® 1.8 GHz ( 512 KB, 800 MHz )

ASUS P5G41-M LE ( Intel G41, VGA+Sound+GbLAN )

Seagate 250 GB SATA2 7200rpm with FAN

Kingston 1GB DDR2 800 MHz

Intel GMA 4500MHD Graphic

Acer G195HQ 18.5 ” Crystal LCD

LiteOn 24x SATA DVD Writer

A4Tech PS2 MyanmarSar Keyboard 8520D

A4Tech PS2 Optical Mouse 8520D with Pad

Somic SM-991 Head Set

5.1 Channels Integrated Sound

PIV Normal Casing with PowerBenZ 450W eATX PSu

345,000 Ks

Supplier name: King POWER COMPUTER

www.kingpowercomputer.com

Personal computer

Price ( Kyats )

Gigabyte

-Dual Core 2.6 Pen

-Gigabye G 31M-ES2L

-250GB Sata ( Seagate )

-1 GB DDR2/8

-VGA 384 GB ( Onboard )

Casing ( East )

Supply 500w ( East )

210,000 Ks

Gigabyte

-Dual Core2.6 Pen

-Gigabye G 41 M-ES2L

-320 GB Sata ( Seagate )

-1GB DDR2/800

-VGA 1GB ( Onboard )

-Casing ( East )

-Supply 500w ( East )

217,500 Ks

Gigabyte

-Core 2 Double 2.93 Pen

-Gigabye EP41-UD3L ( G-41 )

-500 GB Sata ( Seagate )

-2 GB DDR2/800

-1 GB PCIE ATI 4670 ( Giga )

-Casing ( Orient )

-Supply b-480TX

402,500 Ks

Gigabyte

-Core 2 Quad 2.5 Pen

-Giga P55A-UD3P ( P-55 )

-500 TB Sata ( Seagate )

-4GB DDR2/800

-2GB PCIE NV 9600 ( Giga )

-Casing ( Orient )

-Supply 480ATX

985,000 Ks

MSI

-Dual Core 1.8 Cel

-MSI G 31 M3

-250GB Sata ( Seagate )

-1 GB DDR2/800

-VGA 256MB ( Onboard )

-Casing ( Orient )

-Supply 500w ( Orient )

180,000 Ks

MSI

-Dual Core 2.6 Pen

-MSI G 41 M3

-320 GB Sata ( Seagate )

-2 GB DDR2/800

-VGA 256MB ( Onboard )

-Casing ( Orient )

-Supply 500 tungsten ( Orient )

237,000 Ks

-Intel Celeron 1.8 Cel

-BIOSTAR G 31-M7 TE

-250GB Sata ( Seagate )

-1 GB DDR2/800

-VGA 256MB ( Onboard )

-Casing ( Orient )

-Supply 500w ( Orient )

175,500

KING POWER besides selling LCD proctors

LCD Monitor

Price ( Kyats )

ACER 2 Years Parts & A ; 3 Old ages Service

18.5 ” LCD ACER G195 HQ

116,000 Ks

VIEWSONIC 15 ” CRT VIEW E 50 C

60,000 Ks

VIEWSONIC 16 ” VIEW VA 1616w

110,000 Ks

VIEWSONIC 18.5 ” LCD VIEW Speaker VA 1913w

127,000 Ks

SAMSUNG 17 ” CRT Samsung

70,000 Ks

SAMSUNG 18.5 LCD Samsung 933SN+

124,000 Ks

KING POWER Keyboard and Mouse sale

SONY Mouse

2000 Ks

DELL Mouse

5000 Ks

KEYBOARD A4Tech

7500 Ks

KEYBOARD GIGABYTE

11000 Ks

AOPEN KEY+MOUSE

8000 Ks

A4TECH KEY+MOUSE

8000 Ks

UPS Sale

UPS Type

Price ( Kyats )

ObEST 600W

29,000 Ks

SVC 600 W

32,000 Ks

POWER TREE 650 W

38,000 Ks

STAR 650 VA

32,000 Ks

STAR 650 VA LED ( Auto )

38,000 Ks

Leading 1200 VA ( Auto Ch )

64,000 Ks

Personal computer

I prefer Personal computer from ASIA TECH because PC monetary value from ASIA TECH are normal monetary value, 2 Year Parts and Services Warranty. And this store is good known in local and their services are reliable.So I choose the followers from ASIA TECH. Price is 360,000 kyats for this set.

Motherboard ASUS P5P41TLE

Processor DUAL CORE 2.8GHz

Memory 2GB ( DDR3 )

HDD 320GB

Graphic EAH4350 512MB

CasingPowerSupply Delus Casing + 450W 28A Supply

Keyboard+Mouse Delux KB+ Mouse

Proctor

I choose LCD Monitor as 18.5 ” LCD ACER G195 HQ from KING POWER because it gives 2 old ages parts and 3 old ages service. It will be 116,000 kyats.

Printer

I choose

Canon Laser – 3050 Printer

14 PPM

2400 dpi

Cartridge-14,000 from MARVEL TECH Computer Gross saless and Service Centre. MARVEL TECH pressmans are inexpensive and besides give 1year parts and 3 old ages service. It will be 100,000 kyats.

Task – 4

Stakeholders

Communication

When

Why

Undertaking Manager

Supply the squad with a vision of the undertaking objectives. Reviewing the codification and giving coding guidelines. Making and updating the functional specifications.

Involve in the start of the undertaking until the terminal of undertaking

This direction map will be cardinal in footings of resource direction, guaranting that undertaking forces are assigned to the portfolio of undertakings every bit good as nutrient and rations type activities.

Suppliers

Suppliers of merchandises and services used in the school

The Supplier so confirms reception of the Purchase Order and issues an ETA ( Estimated clip of Arrival ) for merchandise. The ETA describes the likely timeframe for bringing of the undertaking direction template merchandise to the designated undertaking location.

The Purchase Order is so processed by the provider and the merchandise delivered to the undertaking as ordered. The Procurement Manager so reviews the merchandise and identifies and resolves any merchandise issues. The merchandise is so accepted and supplier payment is authorised.

Project squad members

The full undertaking squad must non merely understand that each and every squad member needs to acknowledge the importance and impact of effectual communicating on the overall undertaking, but besides that they know each of them has a function and is responsible for doing it go on. The squad must besides cognize the benefits they will harvest upon communication, the methods that will be deployed and how to get the better of any possible challenges.

Produce the end products ( deliverables ) for the undertaking ; take part in the undertaking direction procedure ; lend their accomplishments and attempt to execute undertakings

Opportunities for misinterpretations are minimized, if non wholly eliminated. Focus remains on the undertaking, finishing undertakings and activities, and whatever attempt is necessary in the best involvement of the undertaking.

Senior direction

Duty for set uping the policies and patterns that facilitate a flexible workplace and are appropriate to the centre ‘s work, work force and geographic locations.

Guaranting that new appointees are introduced to the policy during their initiation

Resource Directors

Project resource direction is the planetary procedure for pull offing the allotment, application and use of resources ( people, fundss and equipment ) throughout the undertaking lifecycle.

Resource direction begins with undertaking induction, when resource demands and schemes must be analyzed, specified and accepted as portion of the undertaking “ charter ” .

Wordss and constructs involved in undertaking resource direction, and is structured for practical mention, forming these elements harmonizing to aim and map.

Line Directors

Duties in making and prolonging a flexible workplace. This is best done through occasional personal contact from senior directors instead than electronic mails, when possible.

If staff members resign because their demand for flexible working agreements can non be met, the clip that the line director will necessitate to pass enrolling a replacing typically will be far greater than that needed for planning and easing flexible work conditions.

Line directors are to the full cognizant of the Center ‘s committedness to a flexible workplace and of their duties in making and prolonging a flexible workplace.

Undertaking examiners

Budgets, people, clip, required testing — all have to be identified up front and scheduled during the undertaking rhythm.

This must be done prior to the beginning of any design or cryptography.

Purpose of proving is to show that the merchandise will run into the client ‘s demands, and non merely to show that the plan runs. If those demands are non clearly identified prior to the design stage, clip may be spent on less of import characteristics and the needed maps may be missed. If a undertaking fails to run into demands, so it ‘s a complete waste of clip. The aim of any undertaking should be client satisfaction. That can be achieved merely if everyone is in understanding on what the concluding result of the undertaking should be.

Appendixs

Mentions